NS5-MQ10B-V2 Omron, NS5-MQ10B-V2 Datasheet - Page 82

no-image

NS5-MQ10B-V2

Manufacturer Part Number
NS5-MQ10B-V2
Description
5 Mono Tchsrn,Serial+USB,Bk 60
Manufacturer
Omron
Datasheet

Specifications of NS5-MQ10B-V2

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
3-6 Using Memory Cards
3-28
5. The status of the PT indicator during data transfer is as shown below.
6. Turn OFF the power.
7. Remove the Memory Card.
8. Turn OFF all the DIP switch pins.
9. Turn ON the power.
A warning message will not be displayed when automatic upload is executed even if the PT
model, version, and language for the system programs and screen data that are stored in the
PT are different from those that are stored in the Memory Card.
Always check carefully that the PT model and Memory Card details match before transfer-
ring data automatically.
When data transfer security has been set for the project data stored in the PT to protect the
project data from unauthorized data transfers, an automatic upload will not be performed. To
upload the data, use the manual transfer procedure described in Manual Transfer, below.
Use screen operations to select the direction (download or upload), contents (Project, Pro-
ject & System, or System), and banks.
Use one of the following procedures to manually transfer data.
1. Turn OFF the power to the PT, turn ON pin 6 of the DIP switch, and turn ON the power to
2. Execute Memory Card Transfer from the Special Screen Tab Page of the System Menu.
Use the following procedure to manually transfer data mentioned above in step 1.
1. Turn OFF the power to the PT.
2. Turn ON pin 6 of the DIP switch.
3. Insert the Memory Card into the PT.
4. Turn ON the power.
5. The following screen will be displayed on the PT.
6. Specify the direction of the transfer (download or upload), the transfer contents (project,
Manual Transfer
OFF
1
Do not remove the Memory Card during data transfer.
Transferring data:
Transferring completed:
Error occurred:
Refer to page 3-27 if an error occurs.
the PT.
Refer to 6-8-9 Memory Card Transfers for details.
project and system program, or system program), and bank. The IPP file name and sys-
tem version that are stored in both the specified bank of the Memory Card and the PT
will be displayed in the Project File and System Version fields. After confirming the details,
press the Go Button.
DIP switch pin and status
OFF
2
OFF
3
OFF
4
OFF
5
Indicator flashes orange.
Indicator flashes green.
Indicator flashes red.
ON
6
Enables manually downloading or uploading
the system program and screen data.
Operation

Related parts for NS5-MQ10B-V2