064 UNIV HDR SP 4S 15DP STD

 

1-102153-2

Manufacturer Part Number1-102153-2
Description064 UNIV HDR SP 4S 15DP STD
ManufacturerTE Connectivity
1-102153-2 datasheets

Availability: By request

International delivery:

Warranty: 60 days

Shipping & payment terms

Added to cart

 

Specifications of 1-102153-2

Rohs CompliantNOProduct LineAMP-LATCH
ProfileStandardPcb Mounting OrientationVertical
Pcb Mount RetentionWithoutMating Connector LockWithout
Housing Style4-SidedEjection LatchesWithout
Post Size (mm [in])0.64 [.025]ShroudedYes
Termination Post Length (mm [in])2.79 [0.110]Solder Tail Contact PlatingTin-Lead over Nickel
Header TypeUniversal Ejection Pin HeadersNumber Of Positions64
Centerline, Matrix (mm [in])2.54 x 2.54 [.100 x .100]PreloadedYes
Contact Plating, Mating Area, MaterialGold (15), Gold Flash over Palladium NickelContact ShapeSquare
Connector StyleHeader - PinMating Alignment TypeCenter, Dual Polarizing Bar, Military
Mating AlignmentWithHousing MaterialThermoplastic - GF
Ul Flammability RatingUL 94V-0Housing ColorBlack
Rohs/elv ComplianceELV compliant, 5 of 6 CompliantLead Free Solder ProcessesWave solder capable to 240°C, Wave solder capable to 260°C, Wave solder capable to 265°C
Temperature RatingStandardPcb Thickness, Recommended (mm [in])1.57 [0.062]
1
Page 1
2
Page 2
3
Page 3
4
Page 4
5
Page 5
Page 4/5

Download datasheet (644Kb)Embed
PrevNext
4.
QUALITY ASSURANCE PROVISIONS
4.1.
Qualification Testing
A.
Specim en Selection
Specim ens shall be prepared in accordance with applicable Instruction Sheets and shall be
selected at random from current production. All test groups shall each consist of a m inim um of 5
headers of each type.
B.
Test Sequence
Qualification inspection shall be verified by testing specim ens as specified in Figure 2.
4.2.
Requalification Testing
If changes significantly affecting form , fit or function are m ade to the product or m anufacturing process,
product assurance shall coordinate requalification testing, consisting of all or part of the original testing
sequence as determ ined by developm ent/product, quality and reliability engineering.
4.3.
Acceptance
Acceptance is based on verification that the product m eets the requirem ents of Figure 1. Failures
attributed to equipm ent, test setup or operator deficiencies shall not disqualify the product. W hen
product failure occurs, corrective action shall be taken and specim ens resubm itted for qualification.
Testing to confirm corrective action is required before resubm ittal.
4.4.
Quality Conform ance Inspection
The applicable quality inspection plan will specify sam pling acceptable quality level to be used.
Dim ensional and functional requirem ents shall be in accordance with the applicable product drawing
and this specification.
Rev F
108-40018
4 of 5