1-111626-8 TE Connectivity, 1-111626-8 Datasheet
1-111626-8
Specifications of 1-111626-8
Related parts for 1-111626-8
1-111626-8 Summary of contents
Page 1
... Insulation displacement contacts terminated centerline ribbon cable. 1.2. Qualification When tests are performed on the subject product line, procedures specified in Figure 1 shall be used. All inspections shall be performed using the applicable inspection plan and product drawing. 1.3. Qualification Test Results Successful qualification testing on the subject product line was completed on 24Jun94 ...
Page 2
... Performance and Test Description Product is designed to meet the electrical, mechanical and environmental performance requirements specified in Figure 1. Unless otherwise specified, all tests are performed at ambient environmental conditions per Test Specification 109-1. 3.5. Test Requirements and Procedures Summary Test Description Examination of product ...
Page 3
... Shall meet visual requirements, show no physical damage, and shall meet the requirements of NOTE additional tests as specified in the Product Qualification Test Sequence in Figure 2. Rev C Requirement 1. ozf] maximum per contact. TE Spec 109-42, Condition A. 0.14N [0.5 ozf] minimum per contact. See Note. ENVIRONMENTAL See Note. ...
Page 4
... Dielectric withstanding voltage Insulation resistance Vibration Physical shock Mating force Unmating force Durability Thermal shock Humidity/temperature cycling Mixed flowing gas Temperature life (a) See paragraph 4.1.A. NOTE (b) Numbers indicate sequence in which tests are performed. (c) Precondition samples with 5 durability cycles. Rev C Test Group ( ...
Page 5
... Acceptance Acceptance is based on verification that product meets the requirements of Figure 1. Failures attributed to equipment, test setup or operator deficiencies shall not disqualify the product. When product failure occurs, corrective action shall be taken and samples resubmitted for qualification. Testing to confirm corrective action is required before resubmittal ...
Page 6
... Termination Resistance & Temperature Measurement Points Mounting & Clamping Location For Vibration & Physical Shock Rev C Figure 4 Top View Side View Figure 5 108-1372 ...