AS6M-2Y2 IDEC, AS6M-2Y2 Datasheet - Page 23

no-image

AS6M-2Y2

Manufacturer Part Number
AS6M-2Y2
Description
Switch
Manufacturer
IDEC
Datasheet
(06/11/10)
Panel Mounting of Flush
Bezels
• L6 series
1. Remove the contact block from the
2. Attach the flush bezel to the opera-
3. Insert the contact block, with the
• A6 series
1. Remove the locking ring and anti-
2. Attach the flush bezel to the opera-
Panel Mounting of Flush
Bezels with Switch Guard
For installation, see Panel Mounting of
Flush Bezels.
Instructions
• For other instructions, refer to L6 series catalog and page 19.
L6/A6 Operator
operator. Remove the locking ring
and anti-rotation ring. To remove the
operator from the contact block, turn
the locking lever in the direction
opposite to the arrow on the hous-
ing.
tor. Then insert the assembly into
the panel. Attach the mounting
bracket and tighten the locking ring.
(Do not use the anti-rotation ring
supplied with the operator.)
For round flush bezels, place the
projection on the bezel to the groove
on the TOP side of the operator and
mount onto the panel.
TOP markings on the contact block
and the operator placed in the same
direction. Then lock the units, turn-
ing the locking lever in the direction
of the arrow.
rotation ring from the operator.
tor. Then insert the assembly into
the panel. Attach the mounting
bracket and tighten the locking ring.
(Do not use the anti-rotation ring
supplied with the operator.)
For round flush bezels, place the
projection on the bezel to the groove
on the TOP side of the operator and
mount onto the panel.
Remove
Anti-rotation ring supplied
with the operator
Flush Bezel/
Flush Bezel with Switch Guard
Panel
Mounting bracket
supplied with the
flush bezel
Locking ring
Flush Silhouette L6/A6
Installing the Rubber Boot
Attach the rubber boot and the flush
bezel to the operator. Then insert the
assembly into the panel. Attach the
mounting bracket and tighten the lock-
ing ring. Tighten the locking ring to the
recommended tightening torque of
0.88N·m. (Do not use the anti-rotation
ring supplied with the operator.)
• Precautions for Installing the
Install the rubber boot to wrap around
the entire periphery of the flush bezel.
Make sure that the projection on the
rubber boot is placed into the groove
on the back of the bezel. If the projec-
tion is not placed correctly, the normal
waterproof/dustproof characteristics
are not ensured.
Rubber Boot
Rubber boot for
flush silhouette
control units
Install
Projection on
the rubber boot
Remove
L6/A6 series
operator unit
Anti-rotation ring supplied
with the operator
Groove on
the rubber boot
Flush bezel for rubber boot
Correct
Incorrect
Rubber boot installed on
the flush bezel
Panel
Mounting bracket
supplied with the
flush bezel
Locking ring
Series
Replacing the Lens
• Removing
Remove the lens assembly (lens,
marking plate, and lens holder) from
the operator by holding the lens
removal tool (MT-101) and pull out.
• Installing
Insert the operator in the correct direc-
tion.
Accessories
ø16
23

Related parts for AS6M-2Y2