Page 1
... Tyco Electronics Electronics personnel, without written authorization from Tyco Electronics Corporation, Harisburg, Pennsylvania USA *Trademark R6-76 (Rev. 07-01) DATE 28/10 /98 APVD M.Gosselink This specification is a controlled document and subject to change. Contact the Engineering Control Organization for the latest revision. 108 - 19052 19/Jun/06 Rev ...
Page 2
... Products shall be of design, construction and physical dimensions as specified on the applicable product drawings. All connector types of the Micro-MaTch Miniature connector System are available from positions (only even numbers ) Centerline distance between contacts is 1,27 mm (0,50” multiple of this case of selectively loaded connectors, which are available for all versions. 3.2 Material and Finish: Contacts: Phosphor Bronze according DIN specifications, tinplated over nickel underlayer ...
Page 3
... Wire-to-board and/or Board-to-board connections with the connector system positioned on the solder side of the PC board -for instance Surface Mount Application- • Permanent connections of ribbon cable to PC board, using the Paddle board connector version. • Wire-to board connection with discrete wires. ...
Page 4
... COSI- cable specification The Micro-MaTch COSI connector is designed for untwisted discrete wires in the range from 20-28 AWG. - Maximum insulation diameter for wires between 20-24 AWG is ∅ 0. Maximum insulation diamter for wires between 24-28 AWG is ∅ 1.27 mm 3.6 ...
Page 5
... SMD Female Top Entry with Male On Wire Paddle board Crimp on Snap In Rev. F R6-77 (Rev. 07-01 Ambient Temperature (°C) Female Top Entry with Male On Board B valid for: Female Top Entry with Male On Wire Female Side Entry with Male On Board SMD inboard with Male On Wire 108-19052 100 105 Page ...
Page 6
... Para 2.4.2. ( Reflow soldering method ) In acc. with: Tyco Test Spec 109-201 Reflow curve § 3.4.B.2. Procedures In acc. with IEC 512-2 test 3a. In acc. with IEC 512-2 test 4a. In acc. with IEC 512-2 test 2a. Under dry circuit conditions. All contacts measured. Page ...
Page 7
... In acc. With IEC 912 test 2a Under dry circuit conditions All contacts measured. In acc. With IEC 512-2 test 2a Under dry circuit conditions All contacts measured. Procedures In acc. with IEC 512-8 test 5b. (COSI: 512-8 test15a) Contact retention in housing female connector In acc. with IEC 512-5 test 9a. Page ...
Page 8
... In acc. with IEC 512-7 test 13a (COSI 13b) In acc. with IEC 512-4 test 6d. In acc. with IEC 68-2-6 test Fc.procedure 8.2.1 At push in forces connecors must be supported by a part of the application tooling. ...
Page 9
... Visual examination 2. 3. Climatic sequence a) Dry heat b) Damp heat cyclic, first cycle c) Cold d) Damp Heat cyclic, remaining 5 cycles 4. 5. Visual examination Testgroup 2 1. Visual examination 2. Engaging force 3. 4. Separating force 5. Mechanical operation and 6. engaging force last cycle 7. 8. Damp heat cyclic, 6 cycles 9 ...
Page 10
... Visual examination Testgroup 8: 1. Visual examination 2. 3. Dry heat under cyclic current loading 4. 5. Visual examination Testgroup 9: 1. Visual examination 2. Pre-conditioning (24 hrs at lab. conditions Voltage proof 5. Climatic sequence a) Dry heat b) Damp heat cyclic, first cycle c) Cold d) Damp Heat cyclic, remaining 5 cycles 6 ...
Page 11
... Tests Testgroup 1 1. Visual examination 2. Climatic sequence a) Dry heat b) Damp heat cyclic, first cycle c) Cold d) Damp Heat cyclic, remaining 5 cycles 3. Visual examination Testgroup 2: 1. Visual examination 2. 3. Rapid change of temperature 4. 5. Visual examination Testgroup 3: 1. Visual examination 2. Solderability 3. Visual examination Testgroup 4: 1 ...
Page 12
... Dry heat under cyclic current loading 4. 5. Visual examination 3.7.4 Additional tests for Female SMD (Top Entry and in-board) with Male on Wire/Board. Tests Testgroup 1 1. Visual examination 2. Pre-conditioning (24 hrs at lab. conditions Voltage proof 6. Climatic sequence a) Dry heat b) Damp heat cyclic, first cycle ...
Page 13
... Testgroup 1 1. Visual examination 2. 3. Climatic sequence a) Dry heat b) Damp heat cyclic, first cycle c) Cold d) Damp Heat cyclic, remaining 5 cycles 4. 5. Visual examination Testgroup 2 1. Visual examination 2. Engaging/separating force 3. 4. Mechanical operation 5. Engaging/separating force 6. 7. Damp heat cyclic 8. Engaging/separating force 9. 10. ...
Page 14
... Damp heat cyclic, first cycle c) Cold d) Damp Heat cyclic, remaining 5 cycles 5. 6. Voltage proof 7. Visual examination 4. Rev. F R6-77 (Rev. 07-01) Measurements Insulation resistance Insulation resistance 108-19052 Paragraph 3.6.1 3.6.1 3.6.22 3.6.1 3.6.1 3.6.6 3.6.7 3.6.23 3.6.21 3.6.24 3.6.21 3.6.6 3.6.7 3.6.1 Page ...
Page 15
... At least 5 connectors of the 6 positions or at least 30 contacts shall be used for each testgroup. 4.1.2 Test sequence Qualification inspection shall be verified by testing samples as specified in spec. 108-19052 Par 3.7. 4.2 Requalification testing If changes significantly affecting form, fit or function are made to the product or the manufacturing process, product assurance shall co-ordinate requalification testing, consisting of all or part of the original testing sequence as determined by development/product, quality and reliability engineering ...