XRP7724EVB-DEMO-2P-KIT Exar, XRP7724EVB-DEMO-2P-KIT Datasheet - Page 24

no-image

XRP7724EVB-DEMO-2P-KIT

Manufacturer Part Number
XRP7724EVB-DEMO-2P-KIT
Description
Power Management IC Development Tools Eval Kit for XRP7724
Manufacturer
Exar
Type
PWM Controllersr
Datasheet

Specifications of XRP7724EVB-DEMO-2P-KIT

Product
Demonstration Kits
Tool Is For Evaluation Of
XRP7724
Input Voltage
4.75 V to 25 V
Output Voltage
0.6 V to 5.5 V
Interface Type
I2C
Maximum Operating Temperature
+ 125 C
Minimum Operating Temperature
- 40 C
Output Current
130 mA
For Use With
XRP7724
8.3 Control of Non-conforming Product
8.4 Analysis of Data
Non-conforming material is to be clearly identified and segregated from acceptable material to avoid use or
shipment of non-conforming product.
If non-conformities are detected, a discrepant material report can be issued and the product put on hold
pending an evaluation of the severity of the non-conformance. Material rejected for serious non-
conformances is forwarded to the Material Review Board administrator where it is segregated pending
Material Review Board disposition.
Material Review Board disposition decisions are entered onto the Discrepant Material Report, e.g.; use as
is, scrap, 100% screen, return to supplier, Customer waiver & rework. Results of the rework activities are
confirmed on a rework run card or rework manufacturing instruction. Reworked material shall be reinspected
to original specification requirements.
Records of the nature of non-conformities and any subsequent actions taken, including concessions
obtained shall be maintained as per applicable specification.
If non-conforming product is detected after delivery, the Customer will be contacted.
Data collected from the quality management system and product realization processes will be analyzed to
provide necessary information toward Customer satisfaction by using Return Material Authorization,
Customer Surveys, etc. and also to ensure that product meets the planned requirements.
information is utilized to support preventive action process and also to provide information to the Company’s
suppliers for continual improvement.
Under Exar's Total Quality Management philosophy, the Company’s suppliers are expected to furnish
material that meets the specification.
furnished by suppliers that are ISO 9001 registered and provide Exar with periodic SPC data. Internal
Quality Assurance inspection may be performed on an exception basis and any resulting rejections
will be dispositioned by the Material Review Board.
In-process inspection and testing shall be carried out by Production in accordance with the conditions
specified on the manufacturing instructions.
Prior to testing of product, the setup is verified using correlation units maintained specifically for this
purpose. Mark and Pack performs the final external visual inspection.
Plant Clearance is the last inspection operation performed before the product is shipped to the
Customer. This function is performed by shipping personnel at Exar or at the subcontract test facility.
Non-conforming product is segregated and reworked, scrapped or submitted to the Material Review
Board for disposition in accordance with section 8.3 of this manual.
The manufacturing instructions define all production and inspection/testing stages of the process flow.
No deviation from the chronological order in the manufacturing instructions is permitted.
Completion of every step on the manufacturing instructions has to be confirmed by entry of the
employee ID number of the respective production or inspection personnel.
inspections or tests also have to be recorded on the manufacturing instructions. The completed
manufacturing instructions are the base document for traceability purposes. Records are maintained
as per applicable specification.
TITLE:
Exar Quality Manual
FOR REFERENCE ONLY
Incoming inspection is not normally required on material
SPEC #: QA031
REV: QQ
The results of any
PAGE
24 of 26
Gathered

Related parts for XRP7724EVB-DEMO-2P-KIT