M3A-2114G72 Renesas Electronics America, M3A-2114G72 Datasheet - Page 20

no-image

M3A-2114G72

Manufacturer Part Number
M3A-2114G72
Description
DEV M32172/M32173 (MCU SOCKET) S
Manufacturer
Renesas Electronics America
Type
MCUr
Datasheet

Specifications of M3A-2114G72

Contents
Board, Serial Cable, C Compiler, Debugger, Programmer and Documentation
For Use With/related Products
M32172, M32173
Lead Free Status / RoHS Status
Contains lead / RoHS non-compliant
3
3. Usage Precautions
3.1 Guaranteed Scope of the Starter Kit
3.2 About System Power-on Sequence when connected to the Emulator
The Starter Kit was developed for users to trial the 32170/32171/32172/32173/32174 group microcomputer specifications
and development environment. Therefore, the results arising from the use of the Starter Kit are not guaranteed.
used with any other system, its operation cannot be guaranteed.
When developing/debugging a system product using one of the M32R Family microcomputers, please be sure to use
official development tools separately available as you debug.
The Starter Kit should be run on the designated type of host machine (IBM PC/AT compatibles). This designated type of
host machine, however, is just an anticipated operating environment for the Starter Kit and does not mean that the Starter
Kit operates properly on all relevant types of machines in all relevant environments (e.g., device drivers and peripheral
units).
The M3A-2195 (SDI Interface Board with Housing) was developed for use with only the Starter Kit. If the M3A-2195 is
- When turning on power, turn on M32100T-EZ-E first and then the M3A-2114 Evaluation Board.
- When turning off power, turn off the M3A-2114 Evaluation Board first and then M32100T-EZ-E.
- When turning on power again after turning off power, wait for 10 seconds.
- Power to M32100T-EZ-E can be fed from USB cable.
Note: Unless the Starter Kit is powered on this sequence, the kit may operate erratically or break down.
- When turning on power, turn on M3A-2195 first and then the M3A-2114 Evaluation Board, or simultaneously.
- When turning off power, turn off the M3A-2114 Evaluation Board first and then M3A-2195, or simultaneously.
- When turning on power again after turning off power, wait for 2 seconds.
Note: Unless the Starter Kit is powered on this sequence, the kit may operate erratically or break down.
3.2.1 M3A-2114G52A/ G62A/ G72A in use
3.2.2 M3A-2114G52/ G62/ G72 in use
M3A-2114 User’s Manual (18/68)
Usage Precautions

Related parts for M3A-2114G72