A16-1NRN Omron, A16-1NRN Datasheet - Page 122

NEON LAMP 110V RED FOR A16

A16-1NRN

Manufacturer Part Number
A16-1NRN
Description
NEON LAMP 110V RED FOR A16
Manufacturer
Omron
Type
Neon Lamp, 110 VoltsACr
Series
A16r
Datasheets

Specifications of A16-1NRN

Accessory Type
Neon Lamp Replacement
Supply Voltage
110V
Base Type
Bi-Pin
Colour
Red
Current Rating
1.5mA
Svhc
No SVHC (15-Dec-2010)
Illumination Colour
Red
Operating Lifetime
10000h
Voltage Rating Vac
110V
Average Bulb Life
1000
Color
Red
Illumination
Illuminated
Height
13 mm
Illumination Color
Red
Mounting Style
Snap In
Termination Style
Tabs
Lamp Base Type
Bi-Pin
Rohs Compliant
Yes
Lead Free Status / RoHS Status
Lead free / RoHS Compliant
For Use With/related Products
A16 Series
For Use With
Z1397 - SWTCH KNOB RND 3POS DPDT ILL REDZ1394 - SWTCH KNOB RND 2POS SPDT ILL REDZ1391 - SWTCH KNOB RND 2POS SPDT ILL REDZ1385 - SWITCH KNB RECT 3POS DPDT ILLZ1382 - SWITCH KNB RECT 2POS SPDT ILLZ1379 - SWITCH KNB RECT 2POS SPDT ILLZ1373 - SWITCH KNOB SQ 3-POS DPDT ILLZ1370 - SWITCH KNOB SQ 2-POS SPDT ILLZ1367 - SWITCH KNOB SQ 2-POS SPDT ILLZ1309 - SWITCH PB RND MOM DPDT ILLUM REDZ1305 - SWITCH PB RECT MOM DPDT ILLUMZ1301 - SWITCH PB SQ MOM DPDT ILLUM RED
Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Other names
A161NRN
Z1342
Installation
After installing the Operation Unit, snap in the Switch from the back of the panel.
1. Installing the Switch
Attach rubber packing or the Yellow Plate onto the Switch from its terminal side. Insert the Switch into the panel from the front. Install the lock ring
and mounting nut from the terminal side and tighten.
Adjust the slits on the hole of rubber packing and Yellow Plate to the protruding part of the Unit.
Rubber packing is not necessary when the Yellow Plate is used.
Tighten the nut to the torque of 0.29 to 0.49 N·m.
Casing should be installed with its protruding part adjusted to the slit of the panel hole.
Align the lock ring to the groove of the casing so that the edge is drawn to the panel side.
2. Mounting the Switch
Snap on the Switch to the Operation Unit.
Make sure that the Switch has the correct orientation when snapping
it onto the Operation Unit. Align the white dot on the Operation Unit
with the guide groove on the side of the Switch marked with an “L” as
shown below, and push the Switch into the Operation Unit until it
clicks into place. Confirm that the Switch is securely in place before
using.
120
Mounting to the Panel
Lock hole
Cutout
Lock
White dot
Guide groove
Mounting nut
Rubber packing
(included with the
product) or Yellow
Plate (sold separately)
Lock ring
Panel
L marking
3. Removing the Switch
Insert the prongs of the A16Z-5080 Extractor between the Switch
and the Operation Unit, grip the Switch, and pull to remove.
4. Installing the LED Lamp
When mounting the Lamp, make sure it is facing the direction shown
in the following diagram. Insert the Lamp while matching the protrud-
ing part of the Lamp and the small guides on the outer surface of the
casing.
Rubber packing or Yellow Plate (sold separately)
Protruding part
Panel
Edge
Wide guide
Extractor
(A16Z-5080)
Mounting nut
Narrow guide
Lock ring

Related parts for A16-1NRN