IP20 SOLA HEVI DUTY, IP20 Datasheet - Page 20

Fuse Cover Kit

IP20

Manufacturer Part Number
IP20
Description
Fuse Cover Kit
Manufacturer
SOLA HEVI DUTY
Datasheet

Specifications of IP20

Peak Reflow Compatible (260 C)
No
Kit Contents
2 Covers And Thread Forming Screws
Leaded Process Compatible
No
For Use With
SBE Fuse Block
Lead Free Status / RoHS Status
Lead free / RoHS Compliant

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
IP2000-06
Manufacturer:
IR
Quantity:
20 000
Part Number:
IP2001
Manufacturer:
IOR
Quantity:
317
Part Number:
IP2001
Manufacturer:
International Rectifier
Quantity:
10 000
Part Number:
IP2001
Manufacturer:
IR
Quantity:
20 000
Part Number:
IP2001PBF
Manufacturer:
International Rectifier
Quantity:
10 000
Part Number:
IP2001TR
Manufacturer:
IR
Quantity:
1 000
Part Number:
IP2001TR
Manufacturer:
SMD
Quantity:
150
Part Number:
IP2001TR
Manufacturer:
International Rectifier
Quantity:
10 000
Part Number:
IP2001TR
Manufacturer:
IR
Quantity:
20 000
Part Number:
IP2001TRPBF
Manufacturer:
International Rectifier
Quantity:
10 000
Part Number:
IP2002
Manufacturer:
IOR
Quantity:
512
Part Number:
IP2002
Manufacturer:
OKITA
Quantity:
107
Part Number:
IP2002
Manufacturer:
International Rectifier
Quantity:
10 000
Part Number:
IP2003
Manufacturer:
IR
Quantity:
20 000
Part Number:
IP2003AP
Manufacturer:
IR
Quantity:
20 000
5.2
Spacers added to support
base to accommodate
additional battery cabinets
External Battery Cabinet Installation
Optional Sola/Hevi-Duty external battery cabinets may be connected to the UPS to provide additional
battery run time. External battery cabinets are designed to be placed on one side of the UPS or
stacked beneath the UPS.
1. Visually inspect the external battery cabinet for freight damage. Report damage to the carrier
2. For slide rail installations, first remove the top/side fin. Top/side fin slides forward and then lift
3. Securing hardware and slide rails are sold separately. Please contact your local dealer or Sola/
4. Use the enclosed support bases for the tower option to prevent tip-over. One additional set of
5. Connect the supplied external battery cabinet cable to the rear of the external battery cabinet,
6. The UPS is now equipped with additional backup battery run time. For approximate battery run
!
!
and your local dealer or Sola/Hevi-Duty representative.
up to remove. Optional rack-mount handles are shipped with the external battery cabinet and
may be installed at this time if desired.
Hevi-Duty representative for these additional options and any assistance needed. Fasten the
slides into position with the screws per the instructions included with the slide rails.
support base extensions ships with each external battery cabinet.
then to the rear of the UPS.
times, refer to Table 6.
3U
CAUTION
The external battery cabinet(s) are heavy (see 13.0 - Specifications (Sechnische Daten)).
External battery cabinets can be used in rack-mount or tower configuration. Take proper
precautions when lifting them.
VORSICHT
Externe Batteriegehäuse sind schwer (siehe 13.0 - Specifications (Sechnische Daten)).
Externe Batteriegehäuse können in einer Rack-Montage- oder Turmkonfiguration eingesetzt
werden. Ergreifen Sie die entsprechenden Vorsichtsmaßnahmen, wenn sie gehoben werden
müssen.
NOTE
You must use the included configuration program to program the UPS for the number
of external battery cabinets connected. Instructions for the configuration program are in
7.0 - Configuration Program.
2U
2U
14
Installation and Configuration

Related parts for IP20