XRA1201IL24-F Exar, XRA1201IL24-F Datasheet - Page 23

no-image

XRA1201IL24-F

Manufacturer Part Number
XRA1201IL24-F
Description
Interface - I/O Expanders 16 Bit I2C SMBus GPIO Expander
Manufacturer
Exar
Datasheet

Specifications of XRA1201IL24-F

Rohs
yes
Maximum Operating Frequency
100 KHz
Operating Supply Voltage
1.65 V to 3.6 V
Operating Temperature Range
- 40 C to + 85 C
Mounting Style
SMD/SMT
Package / Case
QFN-24
Interface Type
I2C, SMBus
Output Current
160 mA
Power Dissipation
200 mW

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
XRA1201IL24-F
Manufacturer:
EXAR
Quantity:
1 450
8.0 Measurement, Analysis and Improvement
8.1 General
8.2 Monitoring and Measurement
8.2.1 Customer Satisfaction
8.2.2 Internal Audits
8.2.3 Monitoring and Measurement of Processes
8.2.4 Monitoring and Measurement of Product
Information gathered from monitoring, measurement & analysis of the quality management system
processes from section 4.1 shall be utilized to demonstrate that products meet the planned
requirements and also demonstrate effectiveness of the quality management system.
Requirements for the use of statistical techniques are imposed on the Company’s suppliers and
subcontract manufacturers by the Supplier Management Team described in Section 7.4 of this manual.
The Sales Department utilizes the Customer Corrective Action Requests (CCARs), Return Material
Authorization, Corrective Action Request and Customer survey systems to enhance Customer
satisfaction and may make associated department referrals to address Customer complaints.
Internal quality management system audits are performed annually (unless otherwise specified).
Internal audits are used to verify that the requirements of the quality management system are being
complied with and identify any non-conformances. Internal audits are performed in all areas within
Exar that are covered by this quality manual and the ISO-9001 standard.
The Audit Coordinator has the responsibility to effectively implement, plan/schedule, perform,
document, evaluate and maintain records as per the applicable specification of the internal audits.
He/She is also responsible for verification of the corrective actions taken.
Auditors shall be selected on the basis of their knowledge and capabilities, shall have received formal
training in the auditor task and shall be approved by the Director, Reliability & Quality Assurance. No
auditor shall audit their own work. There shall be no punitive measures taken against either an auditor
or an auditee.
Department managers and supervisors are responsible for ensuring that the quality management
system audit findings are responded to and that the necessary corrective actions are taken in a timely
manner. Results of internal audits together with corrective actions and improvements, are reported to
the Executive Management Team.
Quality management system processes have been defined in section 4.1 of this manual. Responsible
departments shall monitor and measure, where applicable, to ensure planned goals are achieved.
Corrective and preventive action shall be taken as necessary, if measured results do not meet their
goals.
Electrical tests and lot acceptance inspections are in place to monitor and measure the characteristics
of the product.
Test Engineering within the division is responsible for creating and maintaining test programs for Final
Test & QC acceptance. Subcontract testing is controlled by the Supplier Management Team
described in section 7.4 of this manual.
Final Test personnel are responsible for carrying out the required electrical tests and recording the
results on the applicable lot documentation. Test personnel are responsible for performing final QC
Electrical acceptance sample testing and inspection. Inspection and test results are recorded on the
manufacturing instructions.
TITLE:
Exar Quality Manual
FOR REFERENCE ONLY
SPEC #: QA031
REV: QQ
PAGE
23 of 26

Related parts for XRA1201IL24-F