XRP7724EVB-DEMO-2P-KIT Exar, XRP7724EVB-DEMO-2P-KIT Datasheet - Page 17

no-image

XRP7724EVB-DEMO-2P-KIT

Manufacturer Part Number
XRP7724EVB-DEMO-2P-KIT
Description
Power Management IC Development Tools Eval Kit for XRP7724
Manufacturer
Exar
Type
PWM Controllersr
Datasheet

Specifications of XRP7724EVB-DEMO-2P-KIT

Product
Demonstration Kits
Tool Is For Evaluation Of
XRP7724
Input Voltage
4.75 V to 25 V
Output Voltage
0.6 V to 5.5 V
Interface Type
I2C
Maximum Operating Temperature
+ 125 C
Minimum Operating Temperature
- 40 C
Output Current
130 mA
For Use With
XRP7724
7.0 Product Realization
7.1 Planning and Product Realization
7.2 Customer Related Processes
7.2.1 Determination of Requirements Related to the Product
7.2.2 Review of Requirements Related to the Product
Product realization planning falls into one of the following categories:
a) Planning and defining of the overall product quality objectives, systems and procedures.
b) Product realization and preparation of individual quality plans as required for specific quality
c) Definition of requirements for suppliers.
Planning of quality requirements for new product designs are integrated into the product planning
formalities outlined in section 7.3 of this manual. Planning is performed by a cross-functional team with
input from Customers and suppliers as applicable.
Individual contracts, purchase orders, and Customer specifications are reviewed in light of existing
processes, procedures and equipment in order to identify incompatibilities and special needs.
Manufacturing instructions shall be prepared detailing how the Customer’s requirements and product
acceptance are to be achieved if required by contract, or otherwise deemed necessary. Reference
Section 7.2 of this manual.
Requirements for subcontractors are detailed to the extent necessary in quality plans, either generic or
unique to a product or order. These may take the form of procurement specifications, procedural
documents, control plans, flow charts, build diagrams and/or manufacturing instructions. Reference
Section 7.4 of this manual.
The Exar Sales department is responsible to determine Customer specific requirements, including the
requirements for delivery, by review of contract documents, Customer drawings, specifications and
purchase orders. The product data sheet will provide necessary information for product application as
well as statutory, and regulatory requirements, if any.
Contract documents and Customer purchase orders are reviewed by the Exar Sales department prior to
order acceptance. Special contract requirements as well as Customer drawings and specifications are
forwarded to the Manufacturing Instructions Group. The Manufacturing Instructions Group reviews the
referenced documents in accordance with documented procedures to ensure that they are within Exar’s
capabilities. Any requirements that are non-standard or require technical support for resolution are
forwarded to the responsible functional organization. Once comments are received from the functional
organization, the comments including requests for Customer contract exceptions, are summarized on a
specification review form and forwarded to Sales for resolution.
Once any non-standard requirements are resolved, the Manufacturing Instructions Group is responsible
for generating the manufacturing instruction to define the inspection, test, backend processing, packing
and product identification requirements in accordance with Customer specific requirements.
Amendments/revisions to contracts are reviewed in a similar manner to original contracts.
Exar Sales will document and confirm the requirements prior to order acceptance if the Customer
provides no documented statement of requirements. The Manufacturing Instructions Group maintains a
Customer file containing records of the contract review/Customer related processes and any Customer
approved waivers.
programs or contracts.
TITLE:
Exar Quality Manual
FOR REFERENCE ONLY
SPEC #: QA031
REV: QQ
PAGE
17 of 26

Related parts for XRP7724EVB-DEMO-2P-KIT