85-10 3M Interconnect Solutions, 85-10 Datasheet - Page 3

no-image

85-10

Manufacturer Part Number
85-10
Description
Manufacturer
3M Interconnect Solutions
Datasheet

Specifications of 85-10

Lead Free Status / Rohs Status
Compliant
3.10 Seal Top of Mold. Remove liner from adhesive film
3.11 Starting at top of looped film strip and proceeding
NOTE: DO NOT MOVE CABLES OR SPLICE UNTIL
4.4
Note:
3.8
3.9
4.0 Cable Connection for Vertical Run
4.1
4.2
4.3
78-8124-4519-1-B
Level Splice. Ensure that top of mold is level. If support
is needed, support the cable outside of the splice area.
Pour Splice. Mix resin per instructions on resin package.
Pour into mold.
strip supplied with kit. Tape it over the mold leaving a
loop over mold opening.
downward, seal the loop together until top of mold is
closed and the resin fills the mold completely.
Prepare cables in the same manner as steps 3.1 and 3.2.
Cut off one sealing mastic strip.
Remove liner from sealing mastic strip on mold.
Center mold on connector, extending mold 2" above
connector.
Wrap mold around connector and seal mold. Form and
compress sealing mastic strip around and between each
cable to make a resin tight seal.
RESIN HAS COMPLETELY HARDENED.
Compress the sealing mastic strip around the cables
with the thumb as shown in step 3.7.
3