4-3-3 Cord or Cable Installation
One-way Pulling
1, 2, 3...
Midpoint puller
(Station a puller along the pulling
route if the tension is too high.)
Follow the procedure below to prepare an Optical Fiber Cable with a connector
attached.
This section describes three methods for pulling cable through conduit. When
pulling the cord or cable from the reel, raise it off of the ground with a reel jack so
that it can turn easily. Pull the cable off of the reel while spinning the reel so that
only moderate force is place on the cable itself.
When removing cable from the reel, apply less than 2/3 of the maximum tensile
load for the cable and unreel the cable at less than 10 m/min.
With this method, the cord or cable is pulled or laid in one direction. Pull the cable
from the higher to the lower end of the route if one end is higher than the other
and pull from the end closest to the turn if there is a turn or bend in the route.
Station people along the route to monitor the installation or pull the cable to avoid
excessive force (pulling tension, compression, bending, or twisting) on the
cable. Insert a tension meter to monitor pulling tension if the tension is suspected
to be too great.
1. First remove any parts of the connector’s plastic housing that can be re-
2. Cover the Optical Fiber Cords and power wires with a protective tube or cov-
3. Tie the exposed tension member to the steel pulling wire.
moved.
er and wrap the end of the cable with PVC tape.
Steel wire
(pulling wire)
Tension member
Pull steadily by hand or winch.
Protective tape
Protective tube
Endpoint puller
Reel jack
Cable reel
Section 4-3