XW2Z-200J-B9 Omron, XW2Z-200J-B9 Datasheet - Page 45

no-image

XW2Z-200J-B9

Manufacturer Part Number
XW2Z-200J-B9
Description
CONNECTOR CABLE 2M
Manufacturer
Omron
Datasheet

Specifications of XW2Z-200J-B9

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Other names
XW2Z200JB9
Basic Operating Procedure
Communications
Specifications
1-6
18
Communication
methods
Maximum baud rate
Total communications distance
Maximum number of nodes
Communications medium
Data link capacity (per network)
Maximum number of remote I/O
points
Connectable devices
Basic Operating Procedure
Item
Message com-
munications
Data link
Remote I/O
1,2,3...
The following procedure outlines the normal steps to operate the FQM1.
1. Installation
2. Wiring
3. Initial Hardware Settings
4. Turning ON Power and Checking Initial Operation
5. System Setup Settings Using the CX-Programmer
---
500 kbps
100 m (500 m when using thick cable)
---
PLCs and Slaves
Supported
Supported
Communications cycle: About 5 ms (128
inputs and 128 outputs)
63 nodes
DeviceNet cable
3,200 points
(Slaves include I/O Terminals, Remote
Adapters, Sensor Terminals, CQM1 I/O Link
Units, Analog Output Terminals, and Analog
Input Terminals.)
Connect the Power Supply Unit, Coordinator Module, Motion Control Mod-
ules, and End Module. Refer to 3-1-4 Connecting FQM1 Components for
details.
Mount the FQM1. Refer to 3-1-5 DIN Track Installation for details
Connect the power supply wiring and ground. Refer to 3-2-1 Wiring Power
Supply Units for details.
Wiring I/O terminals and connectors. Refer to 3-3 Wiring Module Connec-
tors for details.
Set the DIP switch on the front of the Coordinator Module as required. Re-
fer to 2-3 Coordinator Module for details.
Connect the CX-Programmer. Refer to 3-1-4 Connecting FQM1 Compo-
nents for details.
Check the power supply wiring and voltage and then turn ON the power
supply. Check the RDY indicator and CX-Programmer display. Refer to 8-
2 Connecting the CX-Programmer for details.
DeviceNet
Specification
---
---
Supported
750 kbps
Communications cycle: About 1 ms max.
(128 inputs and 128 outputs)
100 m
32 nodes
2-conductor cable or special flat cable
---
256 points
PLCs and Slaves
(Slaves include I/O Terminals, Remote I/O
Modules, Sensor Terminals, Sensor Ampli-
fier Terminals, and Bit-chain Terminals.)
CompoBus/S
Section 1-6