cynse70032 Cypress Semiconductor Corporation., cynse70032 Datasheet - Page 114

no-image

cynse70032

Manufacturer Part Number
cynse70032
Description
Network Search Engine
Manufacturer
Cypress Semiconductor Corporation.
Datasheet

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
cynse70032-66BGC
Manufacturer:
CY
Quantity:
76
Part Number:
cynse70032-66BGC
Manufacturer:
CYPRESS/赛普拉斯
Quantity:
20 000
Part Number:
cynse70032-66BGI
Manufacturer:
CY
Quantity:
47
Part Number:
cynse70032-66BGI
Manufacturer:
TI
Quantity:
184
Part Number:
cynse70032-66BGI
Manufacturer:
CYPRESS
Quantity:
12
Part Number:
cynse70032-83BGC
Manufacturer:
CY
Quantity:
17
Part Number:
cynse70032-83BGC
Quantity:
20
Part Number:
cynse70032A-66BGI
Manufacturer:
ALTERA
0
16.0
16.1
Proper power-up sequence is required to correctly initialize the Cypress Network Search Engines before functional access to the
device can begin. RST_L and TRST_L should be held low before the power supplies ramp-up. RST_L must be set low for a
duration of time afterward and then set high. The following steps describe the proper power-up sequence.
Figure 16-1 illustrates the proper sequences of the power-up operation
17.0
Figure 17-1 shows how a search engine subsystem can be formed using a host ASIC and Cypress’s CYNSE70032 bank. It also
shows how this search engine subsystem is integrated in a switch or router. The CYNSE70032 can access synchronous as well
as asynchronous SRAMs by allowing the host ASIC to set the same HLAT parameter in the all search engines within a bank of
search engines.
Document #: 38-02042 Rev. *E
1. Set RST_L and TRST_L low.
2. Power up V
3. Hold RST_L low for a minimum of 64 CLK2X cycles. The counting starts on the first rising edge of CLK2X when PHS_L is
applied is not critical.
high, after both V
sequence. For JTAG reset, TRST_L can be brought high after both V
The Proper Power-up Sequence
Power
Application
DD
, V
DDQ
DD
and V
and start running CLK2X and PHS_L. The order in which these signals (including V
PHS_L
CLK2x
DDQ
TRST_L
VDDQ
RST_L
VDD
have reached their steady state voltages. Set RST_L high afterward to complete the power-up
Figure 16-1. Power-up Sequence
64 CLK2x
.
cycles
DD
and V
DDQ
have reached their steady state voltages.
CYNSE70032
DD
Page 114 of 126
and V
DDQ
) are

Related parts for cynse70032