cx28224 Mindspeed Technologies, cx28224 Datasheet - Page 27

no-image

cx28224

Manufacturer Part Number
cx28224
Description
Cx28224/5/9 Inverse Multiplexing For The Atm Ima Family
Manufacturer
Mindspeed Technologies
Datasheet
CX28224/5/9 Data Sheet
1.2.5
1.2.6
Table 1-6. Group State Machine
28229-DSH-001-D
Not Configured
Start up
Start up Ack
Config Aborted
Insufficient links
Blocked
Operational
State
Performance Monitoring (PM)
Group State Machine
Waiting to establish communications with the other end
Start Up acknowledge; has recognized the far end and waiting to enter the Insufficient links state
results when the Far End doesn’t comply with the requested configuration parameters
Fully operational and able to pass data
no groups configured
Both ends have accepted the group parameters and are waiting for the LSM to provide active links
The host controller has inhibited the group (probably for maintenance reasons)
This is the set of functions and capabilities necessary for a Network Element (NE) to
gather, store, and report performance data associated with its monitored digital
transmission entities In contrast with alarm/status indications, performance
parameters are quantitative, not binary, in nature. These performance parameters are
gathered over programmable, predetermined accumulation periods. The
CX28229TAP calculates these statistics over 15 minute intervals. The PM data is
available to the application grouped in a structure encompassing one of the two
accumulation sets: the current 15 minute interval or the previous 15 minute interval.
The PM subsystem uses the raw anomaly and defect information obtained by the FM
subsystem to calculate its performance statistics.
Upon initialization, the PM subsystem is basically disabled: none of the monitored
statistics are calculated.
Overall management of each Group is the responsibility of the Group State Machine.
This actually involves three interrelated processes: the Group State Machine (GSM),
the Group Traffic State Machine (GTSM), and the Link Addition and Slow Recovery
(LASR) procedure. These three processes are used to ensure reliable transmission and
reception of ATM layer cells across all links in the Active state. This includes the
negotiation of group parameters (i.e., symmetry and M values), the bringing up of the
IMA group, and the graceful addition/recovery and deletion of links to and from the
group. The seven possible states are shown in
in more detail in
Mindspeed Technologies
Chapter 3
and in the ATM standard on IMA.
Description
Table
1-6. Again, this will be covered
Introduction to IMA
1
-
13

Related parts for cx28224